A Framework for Improvement of Contractor Selection Procedures on Major Construction Project in Libya.
Thesis
Elsayah, O. S. (2016)
A Framework for Improvement of Contractor Selection Procedures on Major Construction Project in Libya. (Thesis). Edinburgh Napier University. Retrieved from http://researchrepository.napier.ac.uk/Output/453191
The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client o...
The Structural behaviour of timber joints made with fully overlapping nails.
Thesis
Porteous, A. The Structural behaviour of timber joints made with fully overlapping nails. (Thesis)
Napier University. Retrieved from http://researchrepository.napier.ac.uk/id/eprint/2787
An integrated programme of experimental and analytical work was carried out to evaluate the nonlinear
semi-rigid characteristics of timber connections using fully overlapping ...