Project Report
30 November 2007
Published
City, University of London; EU Framework Programme 7 and FP6 and earlier programmes
Kerrouche, A. (2007). Strengthening of the Örnsköldsviks Bridge with Near Surface Mounted CFRP Rods. European Commission
Associate ProfessorSchool of Computing Engineering and the Built Environment
0131 455 2586
A.Kerrouche@napier.ac.uk